EN 12999:2011+A1:2012 no longer gives presumption of conformity under Machinery: every entry's end of legal effect has passed, the latest on 19 September 2020, as of 8 October 2026.
Every entry for this reference carries an end of legal effect that has already passed. The latest is 19 September 2020.
- Reference
- EN 12999:2011+A1:2012
- Title
- Cranes - Loader cranes
- Regime
- Machinery
- Standards body
- CEN
- First in the Official Journal
- 24 August 2012
- Latest end of legal effect
- 19 September 2020
- Citing decisions
- not stated
- List rows
- 1
Other editions of EN 12999 on the lists
- EN 12999:2011 Presumption ended
- EN 12999:2011+A2:2018 Presumption ended
- EN 12999:2020 Cited, cessation date set
- EN 12999:2020+A1:2025 Cited, cessation date set
Compare every edition of EN 12999: which one gives presumption of conformity today
Timeline
- Cited under Machinery
source list - End of legal effect under Machinery, withdrawn by Decision (EU) 2019/1863
source list - Today
What changed for EN 12999:2011+A1:2012
No row-level movement recorded for this reference since day-to-day comparison of the lists began on 28 September 2026. Earlier movements are visible as dated OJ entries in the timeline above.
Machinery
Machinery Directive 2006/42/EC and Machinery Regulation (EU) 2023/1230 · CEN · 1 entry in the Commission's summary list.
| Start of legal effect | Cited by | OJ date | End of legal effect | Withdrawn by | Withdrawal OJ date |
|---|---|---|---|---|---|
| 24 August 2012 | OJ C 256 | 24 August 2012 | 19 September 2020 | 2019/1863 OJ L 286 | 7 November 2019 |
The Commission's workbook for this regime, generated in September 2026, carries no separate 'Start of legal effect' column; the publication OJ date is shown in that column.
Source: Commission: harmonised standards, Machinery (2006/42/EC and 2023/1230).
Status in Deutsch, Français, Nederlands
DE EN 12999:2011+A1:2012, harmonisierte Norm: Konformitätsvermutung beendet, letztes Enddatum 19.09.2020 (Stand 08.10.2026).
FR EN 12999:2011+A1:2012, norme harmonisée: présomption de conformité terminée, dernière date de fin 19.09.2020 (au 08.10.2026).
NL EN 12999:2011+A1:2012, geharmoniseerde norm: vermoeden van overeenstemming beëindigd, laatste einddatum 19.09.2020 (per 08.10.2026).
How to read this page
Every column heading above is the Commission's own, taken from the summary list for that regime. We do not relabel them and we do not infer anything they do not say. A reference can appear on several rows: the Commission adds a row per amended version, each with its own dates.
This page is rebuilt from the archive every day. If a date moves, the change is kept and shown on the changelog.
Watching is free: one email when this reference moves on the official record, nothing else. Reply stop at any time.
Cite this page
Standards Drift, “EN 12999:2011+A1:2012”, https://standardsdrift.com/standards/en-12999-2011-a1-2012/, record as of 8 October 2026. Rebuilt daily from the archived Commission lists; the page you cite is the record on the day you read it, and every earlier version is kept.
Embed the live status
<a href="https://standardsdrift.com/standards/en-12999-2011-a1-2012/"><img src="https://standardsdrift.com/badge/en-12999-2011-a1-2012.svg" alt="EN 12999:2011+A1:2012 status on the EU harmonised standards record" height="22"></a>
The badge is rebuilt every day with the status and date; put it in a technical file index, an intranet page or a client note and it stays current.
All tracked standards · Presumption ending soon
standardsdrift.com · https://standardsdrift.com/standards/en-12999-2011-a1-2012/ · record as of 8 October 2026 · for information only, not the legal edition; the authentic text is the Official Journal.